Infrastructure
A465 Heads of the Valleys – Delivering Infracstructure with quality & precision
Home | Sectors | Infrastructure | Highway Construction | A465 Heads of the Valleys – Delivering Infrastructure with Quality & Precision
FCC commented: “We are delighted with the quality of work that Velta has produced on the scheme and our can-do attitude.”
PROJECT OVERVIEW
Velta has played a key role in the A465 Heads of the Valleys upgrade, delivering essential infrastructure improvements that enhance connectivity and safety across the region. Our work has spanned multiple critical elements of the project, ensuring high-quality construction while maintaining a proactive and solution-focused approach.
Scope of Work
- Surface Water Drainage: Installation of surface water channel drainage from Gurnos to Baverstocks.
- Filter Drainage: Completion of filter drainage systems along the route.
- Blockstone Walls: Construction of three blockstone walls.
- Pedestrian Footpaths: Installation of footpaths and kerb lines along the Gurnos Ring Road.
- Manhole Installation: Installation of various manholes, ranging from 1050mm to 2100mm in diameter.
- Interceptors: Installation of two interceptors.
- Concrete Repairs: Restoration of piers, abutments, and soffits, including steel reinforcement and cementitious patch repairs.
- Deck Repairs: Post-hydro demolition deck repairs with a cementitious mix and aggregates to protect existing steel.
- Barrier & Parapet Work: Removal of existing barriers and installation of new PCC parapet sections and in-situ casting.
- Additional Works: Demolition of approach slabs, waterproofing removal, installation of new drainage, kerbs, and footpaths, and application of mastic joints between parapets.
Client:
Envolve
Value:
600k
Date:
Ongoing
Location:
Merthyr Tydfil, Wales
- Surface Water Drainage
- Filter Drainage
- Blockstone Walls
- Pedestrian Footpaths
- Manhole Installation
- Interceptors
- Concrete Repairs
- Deck Repairs
- Barrier & Parapet Work
- Additional Works
SOCIAL VALUE COMMITMENTS
Beyond construction, Velta is committed to leaving a lasting positive impact on the communities we work in. As part of this project, we have:
- Supported workforce mental health: Partnered with The Lighthouse Charity to provide mental health support for our teams.
- Invested in local education: Donated branded PPE to a local school for outdoor learning projects.
- Helped local families: Made food bank donations to support the community.
- Supported future careers: Conducted interview workshops with a local college to prepare students for careers in construction.
DELIVERING IMPACT WITH CARE
At Velta, we take pride in delivering high-quality infrastructure solutions that enhance communities and drive progress. The A465 Heads of the Valleys project is a testament to our expertise, dedication, and unwavering commitment to excellence.